Health and Safety Documents (RAMS; Safety Policy’s; CDM Safety Plans etc.)

Your Safety Advisor Ltd can prepare specific Health and Safety Documents tailored to your company.  These documents are site specific and include your company name and logo etc.  We can prepare Health and Safety Policy’s; Risk Assessments & Method Statements (RAMS); CDM Safety Plans; COSHH, Noise and Manual Handling Assessments etc.

    Health and Safety Policy & Procedures Manual

    £145.00

    Your Safety Advisor Ltd can prepare a detailed and comprehensive construction based, Health and Safety Policy and Procedures Manual, specific to your company, be it a building, construction or trade related company. Your Health and Safety Policy and Procedures Manual will detail your company name, personnel and logos etc. and the content of the Health and Safety Policy and Procedures Manual will be written to take account of the nature of the work that you do and the size of your company.  The Health and Safety Policy and Procedures Manual will be fully up to date based on UK Health and Safety Legislation and the regulations that affect the UK construction and building industries.

    Our Health and Safety Policy and Procedures Manual is one of the best and most up to date Safety Policy’s available, it has been developed and updated extensively over the last 12 months to make sure that it provides you with the best possible option.  So if you need a Health and Safety Policy and Procedures Manual for a tender, an SSIP (CHAS, SafeContractor, SMAS, Exor, Acclaim ConstructionLine etc) Assessment or just need to make sure that you business is compliant with Health and safety Requirements, then this is the best and most cost effective Health and Safety Policy and Procedures Manual currently available in the UK.

    Remember, its a legal requirement for every company with 5 or more employees to have a written health and safety policy, but even if you’re a sole trader or have less than 5 employees, you still need to have a Health and Safety Policy.  Furthermore your Health and Safety Policy needs to be regularly reviewed and updated, so if yours is more than 12 months old, its time to review and potentially update it!

    Get in touch with us today and we can provide you with the necessary advice and support to ensure you are properly covered.

    Risk Assessment and Method Statement (RAMS) Writing Service

    £150.00

    Our popular Risk Assessment and Method Statement (RAMS) writing service is where we do all the hard work for you and simply email you a completed project specific Risk Assessment and Method Statement (RAMS) based on the information that you provide to us.  The completed Risk Assessment and Method Statement (RAMS) will be specific to your project, include your company details and will be written by a Construction Safety Specialist.  The Risk Assessment and Method Statement (RAMS) will be sent to you as a secure PDF document for ease of printing and forwarding to your clients.

    Keep scrolling down the page for more detailed information about our Risk Assessment and Method Statement (RAMS) Writing service.

    CDM Construction Phase Plan (Non-Notifiable)

    £175.00

    Our CDM Construction Phase Plan (CPP) is a bespoke document that we prepare specifically for you for use on your project. We do the hard work for you and prepare a comprehensive Construction Phase Plan, in accordance with the HSE and your clients requirements.  This is the easiest way for you to comply with your duties under CDM regarding the provision of the Construction Phase Plan.  This service is for low risk, Non-Notifiable Works under CDM and the completed Construction Phase Plan will be emailed to you as a PDF document.

    If your project is classed as being a ‘Notifiable’ project under the Construction (Design and Management) Regulations 2015, then we also offer a more comprehensive service to prepare your Construction Phase Plan for this as well.  Further information can be found by clicking here.

    CDM Construction Phase Plan for Notifiable Works

    £250.00

    For this service we prepare a bespoke CDM Construction Phase Plan (CPP) for use on your specific project.  The Construction Phase Plan will be prepared in accordance with our standard templates and take into account the project requirements. This service enables you quickly and easily comply with your duties under CDM regarding the provision of the Construction Phase Plan.  This service is for a Notifiable Project as defined in the CDM Regulations.  The completed Construction Phase Plan will be emailed to you as a PDF document for ease of onward transmission to your client and supply chain etc.

    Please contact us first before ordering to ensure that you have selected the correct package for the works that you are planning on undertaking.

    CDM Construction Phase Plan (CPP) for Large Projects

    £450.00

    For this service we prepare a bespoke CDM Construction Phase Plan (CPP) for use on larger notifiable projects, with a contract value of up to £2.5M.  The CDM Construction Phase Plan will be prepared in accordance with our standard templates and take into account the project requirements. This service enables you quickly and easily comply with your duties under CDM regarding the provision of the Construction Phase Plan.  This service is for a Notifiable Project as defined in the CDM Regulations.  The completed Construction Phase Plan will be emailed to you as a PDF document.

    COSHH Assessment

    £45.00

    The Control of Substances Hazardous to Health (COSHH) Regulations require Hazardous Substances COSHH Assessments to be completed for the use and handling of all substances which are potentially hazardous to the health of any person.  Your Safety Advisor Ltd is able to prepare a specific COSHH Assessment on your behalf, based on the information that you provide us.  This should include the Material Safety Data Sheet (MSDS) and information about how and where the product is to be used.  The cost of “each COSHH Assessment” is just £45.00 plus VAT and the completed COSHH Assessments will be emailed to you as a PDF document.  Please note that separate COSHH Assessments are needed for each hazardous product used.

    Risk Assessment Writing Service

    £45.00

    Our Risk Assessment writing service is for the preparation of a single Risk Assessment for a single task/activity.  We prepare the risk assessment for you based on the information provided and then email the completed risk assessment to you as a secure PDF document.  Discounts are available for the preparation of multiple risk assessments – please contact us for more information.

    Manual Handling Assessment

    £25.00

    Do you need a completed  Manual Handling Assessment, but don’t have the time to do it or know were to start?

    Let us help, we can complete your manual handling assessments for you.  We can complete manual handling assessments for any specific tasks or activities that you may need, just purchase this service and we will email you asking for the details needed to complete the manual handling assessment on your behalf. It really is as easy as that, we’ll email you the completed assessments complete with your names and logo’s etc already on the documents.

    The completed manual handling assessment will be emailed to you as a PDF document for ease of transmission o your client and others.

    Noise Risk Assessment (Single)

    £45.00

    Noise Risk Assessment – based on the information you provide, we will prepare a noise risk assessment including recommended actions that need to be taken (where applicable) to reduce and control the level of noise exposure.  This assessment is intended for those working on building and/or construction sites using mobile plant, tools and other noise generating equipment/activities etc.  The noise risk assessment will take account of the equipment used/process being undertaken, the environment and the persons likely to be affected by the noise.  The completed Noise Risk Assessment will be emailed to you as a PDF document.